FROM FIRST CONVERSATION TO FINISHED DECK

A floor that fits
the way you boat.

From measuring the boat to fitting the final pad, Top Deck brings a hands on approach to every boat.

Hands-on fitting work on a camouflage Pro-Drive boat.

GOOD WORK STARTS WITH HANDS-ON CARE.

PLAN YOUR FLOORING →Gray topographic-pattern AquaTraction flooring fitted throughout a boat in a wooden boathouse.
01

CONSULTATION

Tell Top Deck about your boat, how you use it, the areas you want covered and the look you have in mind. Photos and the year, make and model give the conversation a useful starting point.

02

DIGITAL MEASUREMENT

Digital measurement and a custom layout help the finished pads follow your boat’s shapes, hatches and working areas.

03

DESIGN

Choose AquaTraction colors and patterns, then add personal details such as logos, rulers, a dash pad or an extra thick helm pad. Your project design is reviewed before fabrication.

04

FABRICATION

Your selected AquaTraction material is cut and detailed to match the approved layout. Each pad has a specific place on the boat.

05

INSTALLATION

The installation surfaces are prepared and the custom pads are positioned and applied. Preparation needs are discussed as part of your project.

06

THE FINISHED DECK

Review the completed fit and finish with Top Deck and get guidance on care. Then take your boat back where it belongs: on the water.

COME PREPARED

MAKE THE FIRST
CONVERSATION COUNT.

  • Boat year, make and model
  • Photos of the whole deck and existing flooring
  • Approximate boat length and width, if known
  • Areas you want covered
  • Favorite colors, patterns or inspiration
  • Logo artwork or custom details you want to discuss
START YOUR PROJECT

YOUR BOAT. YOUR FLOORING.

Tell us what you run and how you use it. We’ll help you choose the flooring, layout and details that fit.